Assignment Name: Farmland/Crop survey of 3000 hectare mining area

Country: Banfora, Burkina faso

Client: Gryphon Minerals Limited/Intersocial consultancy (Sub Contract from Intersocial)


Narrative Description of Project:

  • Mining area boundary demarcation
  • Clearing andMaintenance
  • Crop and Land Survey
  • Preparation of individual Plans
  • Composite Map and Creation of Geodatabase

Actual Services provided:

  • Demarcation, Clearing, and Pillaring of Water Dam Boundary (Approx. 827 Acres)
  • Demarcation, Clearing, and Pillaring of Tailings Dam Boundary (Approx. 1522 Acres)
  • Demarcation, Clearing, and Pillaring of Area E pit and waste Dump Boundary (Approx. 992Acres)
  • Demarcation, Clearing, and Pillaring of Kenyasi East pit and waste Dump Boundary (Approx.. 1230 Acres)
  • Demarcation, Clearing, and Pillaring of Kenyasi Central pit and waste Dump Boundary
  • Demarcation, Clearing, and Pillaring of Kenyasi Resettlement Boundary (Approx.. 158 Acres)
  • Demarcation, Clearing, and Pillaring of Ntotoroso Resettlement Boundary (Approx. 396 Acres)
  • Demarcation, Clearing, and Pillaring of Plant Site Boundary
  • Demarcation, Clearing, and Pillaring of Environmental Control Dams (ECD): ECD II, ECD III, ECD IV, ECDVI Boundary (Aprox 840 acres)
  • Survey of crops and buildings in the above mentioned minetake areas ( 4,212 acres) four thousand two hundred and two acres
  • Demarcation, Clearing, and Pillaring of Kenyasi stool land (kenyasi forest) (Approx. 500 Acres)
  • Engineering Surveys: for the Kenyasi and Ntotoroso Resettlement Site
    • Topographic Surveys and Base map Production
    • Setting –out of clearing Boundaries
    • Setting –Out of Buildings and Structures
    • Setting – Out of Infrastructure: Road, Power lines, drains, water line and Bore holes
    • Volumetric Calculations of Earth works
    • Preparation of As-Built Surveys of Buildings and Infrastructure