Projects

Assignment Name: Topographic & Bathymetric Survey Foe Upgrading & Expansion of Albert Bosomtwe Sam Fishing Harbour (Sekondi) in Republic of Ghana.

Country: Ghana, Sekondi, Western Region

Client: Center for Scientific and Industrial Research (CSIR) Acting for Ecoh Corporation of Japan

Date of Project: July 2013 - August 2013


Narrative Description of Project:

  • Conduct Topographic survey of landed areas approximately 206,000m2 of the existing Harbour to the shore line
  • Prepare contour at intervals of 0.5m reference to Mean Sea Level
  • Build Permanent Beach Marks
  • Conduct Bathymetric Survey of The area Zone A to be surveyed is approximately 165,000m2 along the coastal area of the Project Site
  • Interval of survey line in survey area is 10m
  • The area Zone B to be surveyed is approximately 292,000m2 along the coastal area of the Project Site
  • Interval of survey line in survey area is 20m. Prepare a composite plan of the results of the Topographic survey and Bathymetric

  1. « Previous
  1. Next »